Question
How is the electrode or electrode band mounted to the PS-[]S Electrode Holder, and what parts are required?
Answer
Number of Parts Required During Installation (Bar Electrode)
Automatic Water Supply or Drainage Control (Example)
Number of Parts Required When E1 = 1 m, E2 = 2 m, and E3 = 3 m:
61F-GN:
PS-3S:
F03-01 (SUS304):
F03-02 (SUS304):
F03-03 (SUS304):
F03-14 3P:
F03-14 1P:
1pc
1pc
6pcs
3pcs
9pcs
1pc
1pc
Number of Parts Required During Installation (Electrode Band)
Automatic Water Supply or Drainage Control (Example)
Number of Parts Required for a 3-m Electrode Band:
61F-GN:
PS-3S:
F03-06:
F03-05 3P:
F03-07:
F03-08:
F03-09:
F03-10:
1pc
1pc
3pcs
3m
4pcs
2pcs
2pcs
1pc